Mechanical Botanical

Extension of Existing Facilities
JRC were appointed to carry out the steelwork and cladding works on an extension off the side of the clients existing building. We detailed a portal frame which was connected by drilling and bolting to the existing line of columns. We installed composite roof and wall cladding as well as a mezzanine floor so the client could work and store materials inside with heating. We also installed the sectional overhead doors and personnel doors.
Tonnage
10
Ton
Location
Cirencester
Year
2023
Size
455
m2